Avoiding tree fines starts before the fence arrives
- We measure from the trunk out, not from the curb.
- We keep gates and braces out of root-heavy soil.
- We adjust the layout when the inspector wants a wider buffer.
-
We start with a tree root-zone layout before panels go in, because Berwyn inspectors look at distance, not excuses.
-
We keep temporary fencing off trunks and drip lines, and we protect that space with tree-protection zones in Pyrce Park.
-
We pair tree protection with SWPPP dust compliance in Riverside Drive when grading or demolition stirs up soil.
-
We use concrete-steel bases in the Cermak Road Corridor when wind and traffic keep pushing lighter setups out of line.
-
We place zero-trip-hazard hardware near the Berwyn Metra Station so crews, pedestrians, and tree roots all stay out of trouble.
